Home | FAQ | Links | Contact Us My CommuterLink Alerts
You are here: Skip Navigation Links Home > Construction
ImpactDetailsCountyStart DateEnd Date
HighI-15 EXPRESSLink Construction Roadway Reconstruction I-15 reconstruction and widening. Project is near completion with minor clear up work. Davis1/3/2009 12:00:00 AM9/30/2010 11:59:00 PM
HighZion-Mt Carmel Highway (Tunnel Road) Construction Roadway Reconstruction SR-9 from US 89 at Mt Carmel Junction to Zion Park Closed from 9 am - 4 pm. Open 4 pm to 9 am nightly under traffic control. Expect delays Visit www.nps.gov.zion for alternate routes Kane6/1/2010 12:00:00 AM10/28/2010 11:59:00 PM
HighMarriott-Slaterville Construction Roadway Reconstruction 400 No between 1200 West and I-15 road reconstruction. Interestion at 1200 W, 4th No closed for concrete placement Weber7/16/2010 12:00:00 AM10/30/2010 11:59:00 PM
HighUS 6 Horse Canyon Road Intersection Construction New Construction improvements at mp 266 to mp 268. Traffic reduced to 1 lane with pilot car leading traffic through work zone. Carbon7/23/2010 6:00:00 AM9/30/2010 8:00:00 PM
HighUS 40 SR 208 to Duchesne Maintenance Non-Hard Surface Maintenance paving, chip sealing installing rumble strips. speed limit 40 mph delays up to 20 minutes. Duchesne8/7/2010 12:00:00 AM9/30/2010 11:59:00 PM
High700 East Construction Roadway Reconstruction lane restrictions, flaggers, with some one way traffic. Watch for lane shifts Salt Lake5/2/2010 12:00:00 AM11/30/2010 11:59:00 PM
MediumUS 6 Tucker Construction New Construction Beginning of Skyline Dr. and Starvation Road. Installing box culvert and retaining wall. Preparation for abutment construction. Utah9/30/2008 12:00:00 AM10/30/2010 11:59:00 PM
Medium11400 South Interchange Construction Roadway Reconstruction New interchange and road construction and road widening at 11400 South connecting to I-15 and wideniing from State Street to Bangerter Highway. Salt Lake3/3/2009 12:00:00 AM11/3/2010 11:59:00 PM
MediumI-15 South Layton Interchange Construction New Construction New interchange and lane addition. Lane restritions with minor delays. Work at Main Street at the I-15 overpass; select locations along Fort Lane, Gentile Street Davis7/28/2009 12:00:00 AM8/28/2011 11:59:00 PM
Medium11400 South widening and Construction New Construction between State Street and Bangerter Hwy. Watch for flagging and intermittent closures along the project route Salt Lake1/1/2009 12:00:00 AM9/30/2010 11:59:00 PM
MediumI-15 CORE Lehi through Pleasant Grove Construction Roadway Reconstruction Work Area 1 reconstruction to widen I-15. Expect nightly lane closures and restrictions, travel delays on mainline I-15 interchanges, ramps, and cross streets Utah4/15/2010 12:00:00 AM10/15/2014 11:59:00 PM
MediumI-15 CORE Orem Construction Roadway Reconstruction Work Area 2 1600 No to University Parkway. I-15 widening. Expect nightly lane closures and restrictions, travel delays on mainline I-15 at interchanges, ramps and cross streets Utah4/15/2010 12:00:00 AM10/30/2014 11:59:00 PM
  Page of 5   Next   Last
* Click on a column name to sort the data by that column. Click on the same column a second time to reverse the order.
The "Impact" column grades the traffic flow disruption due to construction, based on UDOT's criteria, as follows:
High = over 15 min delay Medium = 5-15 min delay
Low = 0 - 5 min delay Unknown = unknown delay
Incidents +/-
National Weather Service Forecast +/-
© 2009 UDOT CommuterLink